20 cubic metres of
Timberbond's Structural Flooring was supplied to Kinleith sawmill. Though
additional height clearance was not a parameter of the job, the designer
saw benefits in the efficiency of long unsupported spans. This brought the
cost and time frame for construction down considerably for the job due to
not having to install floor joists etc. Also, by having a lighter floor
system meant that the supporting beams could be smaller.


|