|
The Greerton Swimming
pool was commissioned as an extensions to the existing pool. The new structure
features two main supports that free spanned over 30 metres (100 ft) and
had a beam depth of 2.0 metres (6.6 ft). The structure was finished in
Timberbond's factory with a 2 pot polyurethane coating giving it extra
protection against the harsh chlorine environment.


|